At the request of the Air Force Materiel Command (AFMC), MELE, in concert with AFMC, has developed an innovative environmental management strategy to use limited pollution prevention funding to the greatest benefit possible to reduce environmental compliance cost and risk. That strategy, Compliance Through Pollution Prevention, or CTP2, has become the standard for the Air Force.
To make CTP2 part of daily operations at each AFMC installation, MELE proposed to transform the CTP2 business practices to a Milnet-based platform that could be accessed daily from each installation. The application is known as the AFMC CTP2 Management Action Plan (MAP). Installation level personnel would maintain the information in the database and provide a real-time picture of the pollution prevention level of effort at their installation. Headquarters personnel could look down and use information in the CTP2 MAP for long-term planning at the Command level.
The CTP2 MAP is Oracle 9i compatible and will become the pollution prevention module for the Air Force Civil Engineer’s overall management structure in ACES. CTP2 is fully compliant with Air Force Instructions on Operation Risk Management (ORM) and has been used at approximately 18,000 sites at 12 AFMC installations. MELE also serves as the technical advisor in technology needs identification, prioritization, and resolution, keeping a Joint Service (JCALS) perspective.
Source URL: http://www.meleassociates.com/c/448/CTP2-Environmental-Management-EM-pollution-prevention